|
Discover why it pays to choose Schwank gas-fired infrared heaters and value added services by reading our latest case studies.
Hot Tot Construction heater application
Location photos of the Schwank Hot Tot construction heater - the top performing construction heater that can cut drying/thawing time up to 60%.
Mackie Automotive Systems
supraSchwank heating system for Mackie Automotive Systems building cuts heating bill by $200,000.
View the case study. (1000 kb PDF format)
Acton Arena
How ecoSchwank heating system solved the arena heating challenge.
View the case study. (177 kb PDF format)
|